IS WORK OVER?

Automation index

How much of a 3D animator’s job can AI already do?

A blocking pass and a preview come earlier. Timing, weight, and a director buying it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

3D animator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Blocking, layouts and previews.
Estimate

No public source provides a precise figure. This is our estimate.

22%52%+11.4
Simple rigs, cycles and technical cleanup.
Estimate

No public source provides a precise figure. This is our estimate.

18%45%+8.1
Spline, weight and character acting.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Director and supervisor notes.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Integrate with lighting, fx and editorial.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Taste: which shot lives and which dies.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%30%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Blocking, layouts and previews
  • Simple rigs, cycles and technical cleanup
  • Spline, weight and character acting
  • Director and supervisor notes
  • Integrate with lighting, fx and editorial
  • Taste: which shot lives and which dies
  • animador 3d
  • 3d animator
  • motion graphics

Sources for this job· O*NET 27-1014.00· ESCO/ISCO 2166

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 42HR generalist31%
  2. 43Health information technician31%
  3. 44Pathologist30%
  4. 46Financial advisor30%
  5. 47Tax advisor30%
  6. 48Cashier30%