Automation index
How much of a 3D animator’s job can AI already do?
A blocking pass and a preview come earlier. Timing, weight, and a director buying it do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
3D animator
30%
AI can already do 30% of this job.
#45 / 623
View ranking3D animator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Blocking, layouts and previews.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 52% | +11.4 |
Simple rigs, cycles and technical cleanup.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 45% | +8.1 |
Spline, weight and character acting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 20% | +3.2 |
Director and supervisor notes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Integrate with lighting, fx and editorial.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Taste: which shot lives and which dies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 30% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Blocking, layouts and previews
- Simple rigs, cycles and technical cleanup
- Spline, weight and character acting
- Director and supervisor notes
- Integrate with lighting, fx and editorial
- Taste: which shot lives and which dies
- animador 3d
- 3d animator
- motion graphics
Sources for this job· O*NET 27-1014.00· ESCO/ISCO 2166
IS WORK OVER?
Mason
15%
#607 / 623
View rankingMason
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, measure and order material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Setting out and levels on site.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Raise walls, render and plaster.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Floors, tiling and finishing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, scaffolding and clearing the bay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Coordinate with foreman, plumber and electrician.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- build walls
- plaster
- site work
- Read drawings, measure and order material
- Setting out and levels on site
- Raise walls, render and plaster
- Floors, tiling and finishing
- Safety, scaffolding and clearing the bay
- albanil
- mason
Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112