IS WORK OVER?

Automation index

How much of a 3D animator’s job can AI already do?

A blocking pass and a preview come earlier. Timing, weight, and a director buying it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

3D animator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Blocking, layouts and previews.
Estimate

No public source provides a precise figure. This is our estimate.

22%52%+11.4
Simple rigs, cycles and technical cleanup.
Estimate

No public source provides a precise figure. This is our estimate.

18%45%+8.1
Spline, weight and character acting.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Director and supervisor notes.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Integrate with lighting, fx and editorial.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Taste: which shot lives and which dies.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%30%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Blocking, layouts and previews
  • Simple rigs, cycles and technical cleanup
  • Spline, weight and character acting
  • Director and supervisor notes
  • Integrate with lighting, fx and editorial
  • Taste: which shot lives and which dies
  • animador 3d
  • 3d animator
  • motion graphics

Sources for this job· O*NET 27-1014.00· ESCO/ISCO 2166

Prompt engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Design prompts, tools and chains.
Estimate

No public source provides a precise figure. This is our estimate.

24%58%+13.9
Evals, datasets and regressions.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Integrate with product and safety limits.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Talk to the business about a good output.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Watch hallucinations, bias and cost.
Estimate

No public source provides a precise figure. This is our estimate.

14%20%+2.8
Decide what the model gets, and what it does not.
Estimate

No public source provides a precise figure. This is our estimate.

12%16%+1.9
Total100%34%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Design prompts, tools and chains
  • Evals, datasets and regressions
  • Integrate with product and safety limits
  • Talk to the business about a good output
  • Watch hallucinations, bias and cost
  • prompt engineer
  • ingeniero de prompts
  • llm engineer

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512

Analyse my job

Jobs with similar scores

  1. 42HR generalist31%
  2. 43Health information technician31%
  3. 44Pathologist30%
  4. 46Financial advisor30%
  5. 47Tax advisor30%
  6. 48Cashier30%