IS WORK OVER?

Automation index

How much of a Acoustics engineer’s job can AI already do?

A noise map comes earlier. Actually bringing it down without selling a miracle panel do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Acoustics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reading, the map and the standard.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the insulation and what was not put in.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Simulation, the model and not trusting it alone.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Report, the neighbour and not softening the dB.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The council, the licence and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Bring it down for real, and not selling the miracle panel.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • noise maps
  • insulation
  • dB
  • acoustic simulations
  • standards
  • licences
  • neighbours
  • field readings

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 167Wealth manager27%
  2. 168Hepatologist27%
  3. 169Printing press operator27%
  4. 171Food engineer27%
  5. 172Automation engineer27%
  6. 173Energy engineer27%