IS WORK OVER?

Automation index

How much of a Acoustics engineer’s job can AI already do?

A noise map comes earlier. Actually bringing it down without selling a miracle panel do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Acoustics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reading, the map and the standard.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the insulation and what was not put in.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Simulation, the model and not trusting it alone.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Report, the neighbour and not softening the dB.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The council, the licence and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Bring it down for real, and not selling the miracle panel.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • noise maps
  • insulation
  • dB
  • acoustic simulations
  • standards
  • licences
  • neighbours
  • field readings

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 167Wealth manager27%
  2. 168Hepatologist27%
  3. 169Printing press operator27%
  4. 171Food engineer27%
  5. 172Automation engineer27%
  6. 173Cost engineer27%