IS WORK OVER?

Automation index

How much of a Acoustics engineer’s job can AI already do?

A noise map comes earlier. Actually bringing it down without selling a miracle panel do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Acoustics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reading, the map and the standard.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the insulation and what was not put in.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Simulation, the model and not trusting it alone.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Report, the neighbour and not softening the dB.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The council, the licence and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Bring it down for real, and not selling the miracle panel.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • noise maps
  • insulation
  • dB
  • acoustic simulations
  • standards
  • licences
  • neighbours
  • field readings

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Tunnel engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Heading, the geology and the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Water, the inflow and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Blast, the vibration and the building.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Segment, the ring and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not come down, and not hiding the water.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tunnel headings
  • support
  • inflows
  • blasts
  • segments
  • tunnel geology
  • rings
  • vibrations

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 171Wealth manager27%
  2. 172Hepatologist27%
  3. 173Printing press operator27%
  4. 175Cloud engineer27%
  5. 176Food engineer27%
  6. 177Automation engineer27%