IS WORK OVER?

Automation index

How much of a Actor’s job can AI already do?

A self-tape and a script breakdown come earlier. Hitting a mark on a set, and actually crying, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Actor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Break down the text, mark and memorise.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Self-tapes and casting materials.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Perform on set, stage or in voice-over.
Estimate

No public source provides a precise figure. This is our estimate.

22%6%+1.3
Rehearse with director and cast.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Care for body, voice and emotional continuity.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Promotion, agents and life between jobs.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Break down the text, mark and memorise
  • Self-tapes and casting materials
  • Perform on set, stage or in voice-over
  • Rehearse with director and cast
  • Promotion, agents and life between jobs
  • actor
  • actriz
  • actor de cine
  • actor de teatro

Sources for this job· O*NET 27-2011.00· ESCO/ISCO 2655

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 592Sound technician18%
  2. 593Nail technician18%
  3. 594Veterinary technician18%
  4. 596Kitchen porter17%
  5. 597Forklift operator17%
  6. 598Air traffic controller17%