IS WORK OVER?

Automation index

How much of a Actuary’s job can AI already do?

Running a model and a reserving report is shorter. Signing the assumptions and answering the supervisor is not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Actuary

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Run models, reserves and sensitivities.
Estimate

No public source provides a precise figure. This is our estimate.

24%55%+13.2
Draft technical reports and memos.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Choose assumptions, tables and criteria.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Explain to the board and the supervisor.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Validate data quality and bias.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Signed opinion and professional liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%18%+2.2
Total100%32%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Run models, reserves and sensitivities
  • Draft technical reports and memos
  • Choose assumptions, tables and criteria
  • Explain to the board and the supervisor
  • Validate data quality and bias
  • Signed opinion and professional liability
  • actuario
  • actuary

Sources for this job· O*NET 15-2011.00· ESCO/ISCO 2120

Aerial technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bookings, levels and install logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Roof, mast, cable and outlet.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Configure, tune and explain to the neighbour.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Community, porter and access.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Faults, building ICT and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not falling and not leaving a building without the match.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Bookings, levels and install logs
  • Roof, mast, cable and outlet
  • Community, porter and access
  • Faults, building ICT and fibre
  • antenista
  • instalador de antenas
  • aerial technician

Sources for this job· O*NET 49-2022.00· ESCO/ISCO 7422

Analyse my job

Jobs with similar scores

  1. 22Video producer34%
  2. 23Insurance agent33%
  3. 24Warehouse operator33%
  4. 26Cybersecurity analyst32%
  5. 27IT auditor32%
  6. 28Lawyer31%