Automation index
How much of a Actuary’s job can AI already do?
Running a model and a reserving report is shorter. Signing the assumptions and answering the supervisor is not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Actuary
32%
AI can already do 32% of this job.
#25 / 623
View rankingActuary
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Run models, reserves and sensitivities.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 55% | +13.2 |
Draft technical reports and memos.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Choose assumptions, tables and criteria.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Explain to the board and the supervisor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Validate data quality and bias.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Signed opinion and professional liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 18% | +2.2 |
| Total | 100% | 32% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Run models, reserves and sensitivities
- Draft technical reports and memos
- Choose assumptions, tables and criteria
- Explain to the board and the supervisor
- Validate data quality and bias
- Signed opinion and professional liability
- actuario
- actuary
Sources for this job· O*NET 15-2011.00· ESCO/ISCO 2120
IS WORK OVER?
BIM modeller
28%
#109 / 623
View rankingBIM modeller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, families and clash detection.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
IFC, BEP and trade coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Site, the one who will not open the model, and the meeting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quantities, parameters and the 4D nobody uses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The last-minute change and not breaking the federated model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it can be built, and not over-modelling.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- BIM modelling
- clash detection
- Revit families
- IFC
- BEP
- coordinate trades
- BIM quantities
- federated model
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118