IS WORK OVER?

Automation index

How much of a Actuary’s job can AI already do?

Running a model and a reserving report is shorter. Signing the assumptions and answering the supervisor is not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Actuary

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Run models, reserves and sensitivities.
Estimate

No public source provides a precise figure. This is our estimate.

24%55%+13.2
Draft technical reports and memos.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Choose assumptions, tables and criteria.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Explain to the board and the supervisor.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Validate data quality and bias.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Signed opinion and professional liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%18%+2.2
Total100%32%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Run models, reserves and sensitivities
  • Draft technical reports and memos
  • Choose assumptions, tables and criteria
  • Explain to the board and the supervisor
  • Validate data quality and bias
  • Signed opinion and professional liability
  • actuario
  • actuary

Sources for this job· O*NET 15-2011.00· ESCO/ISCO 2120

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 22Video producer34%
  2. 23Insurance agent33%
  3. 24Warehouse operator33%
  4. 26Cybersecurity analyst32%
  5. 27IT auditor32%
  6. 28Lawyer31%