IS WORK OVER?

Automation index

How much of a Actuary’s job can AI already do?

Running a model and a reserving report is shorter. Signing the assumptions and answering the supervisor is not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Actuary

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Run models, reserves and sensitivities.
Estimate

No public source provides a precise figure. This is our estimate.

24%55%+13.2
Draft technical reports and memos.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Choose assumptions, tables and criteria.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Explain to the board and the supervisor.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Validate data quality and bias.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Signed opinion and professional liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%18%+2.2
Total100%32%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Run models, reserves and sensitivities
  • Draft technical reports and memos
  • Choose assumptions, tables and criteria
  • Explain to the board and the supervisor
  • Validate data quality and bias
  • Signed opinion and professional liability
  • actuario
  • actuary

Sources for this job· O*NET 15-2011.00· ESCO/ISCO 2120

Roofer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, order material and set out slopes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Tile, waterproof and finish ridges.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Heights, anchors and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, client and not cracking tiles.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a leak the first winter.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Measure, order material and set out slopes
  • Tile, waterproof and finish ridges
  • Heights, anchors and weather
  • Site, client and not cracking tiles
  • Logs, quantities and extras
  • Not leaving a leak the first winter
  • techador
  • cubiertas
  • roofer

Sources for this job· O*NET 47-2181.00· ESCO/ISCO 7111

Analyse my job

Jobs with similar scores

  1. 22Video producer34%
  2. 23Insurance agent33%
  3. 24Warehouse operator33%
  4. 26Cybersecurity analyst32%
  5. 27IT auditor32%
  6. 28Lawyer31%