Automation index
How much of a Addiction doctor’s job can AI already do?
An AUDIT form comes earlier. Walking the abstinence when Friday slips do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Addiction doctor
22%
AI can already do 22% of this job.
#407 / 733
View rankingAddiction doctor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
History, AUDIT and the urine screen.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Clinic, the relapse and the one who does not come.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Methadone, the dose and not rushing the taper.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Detox, the bed and the syndrome.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Family, the stigma and not moralising.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Walk the abstinence, and not turning away the one who slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- AUDIT
- methadone
- detox
- relapses
- urine screens
- addiction clinic
- withdrawal
- not moralise
Sources for this job· O*NET 29-1223.00· ESCO/ISCO 2212
IS WORK OVER?
Railway engineer
22%
#389 / 733
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142