Automation index
How much of a Aerial technician’s job can AI already do?
A signal reading and a booking come earlier. Up on the roof until TDT actually shows does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Aerial technician
18%
AI can already do 18% of this job.
#662 / 743
View rankingAerial technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bookings, levels and install logs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Roof, mast, cable and outlet.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Configure, tune and explain to the neighbour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Community, porter and access.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Faults, building ICT and fibre.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not falling and not leaving a building without the match.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Bookings, levels and install logs
- Roof, mast, cable and outlet
- Community, porter and access
- Faults, building ICT and fibre
- antenista
- instalador de antenas
- aerial technician
Sources for this job· O*NET 49-2022.00· ESCO/ISCO 7422
IS WORK OVER?
Commissioning engineer
22%
#392 / 743
View rankingCommissioning engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocol, the loop and the punch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, start-up and the one that is not ready.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Test, the trip and not jumping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Vendors, the one who does not come and the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the deadline and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Start up, and not leaving the interlock jumped.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test protocols
- loops
- punch list
- start-up
- trips
- vendors
- interlocks
- not sign half done
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149