IS WORK OVER?

Automation index

How much of a Aerial technician’s job can AI already do?

A signal reading and a booking come earlier. Up on the roof until TDT actually shows does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Aerial technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bookings, levels and install logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Roof, mast, cable and outlet.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Configure, tune and explain to the neighbour.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Community, porter and access.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Faults, building ICT and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not falling and not leaving a building without the match.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Bookings, levels and install logs
  • Roof, mast, cable and outlet
  • Community, porter and access
  • Faults, building ICT and fibre
  • antenista
  • instalador de antenas
  • aerial technician

Sources for this job· O*NET 49-2022.00· ESCO/ISCO 7422

Power engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Study, the short-circuit and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Substation, the disconnector and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Switching, the five rules and not skipping them.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fault, the relay and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not blow, and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • short-circuits
  • selectivity
  • disconnectors
  • five rules
  • relays
  • substations
  • lockouts
  • not work live

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Analyse my job

Jobs with similar scores

  1. 669Cobbler19%
  2. 670Dog trainer18%
  3. 671Forest ranger18%
  4. 673Varnisher18%
  5. 674Wildland firefighter18%
  6. 675Commercial diver18%