Automation index
How much of a Aerial technician’s job can AI already do?
A signal reading and a booking come earlier. Up on the roof until TDT actually shows does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Aerial technician
18%
AI can already do 18% of this job.
#562 / 643
View rankingAerial technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bookings, levels and install logs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Roof, mast, cable and outlet.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Configure, tune and explain to the neighbour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Community, porter and access.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Faults, building ICT and fibre.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not falling and not leaving a building without the match.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Bookings, levels and install logs
- Roof, mast, cable and outlet
- Community, porter and access
- Faults, building ICT and fibre
- antenista
- instalador de antenas
- aerial technician
Sources for this job· O*NET 49-2022.00· ESCO/ISCO 7422
IS WORK OVER?
Risk manager
29%
#60 / 643
View rankingRisk manager
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Maps, models and risk reporting.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 52% | +11.4 |
Policies, limits and stress tests.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 45% | +8.1 |
Escalate an incident and talk to desks.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Committee, exceptions and negotiation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Data quality and model assumptions.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Stop the risk and sign the opinion.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 29% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Maps, models and risk reporting
- Policies, limits and stress tests
- Escalate an incident and talk to desks
- Committee, exceptions and negotiation
- Data quality and model assumptions
- Stop the risk and sign the opinion
- risk manager
- gestor de riesgos
- riesgo operacional
Sources for this job· O*NET 13-2099.02· ESCO/ISCO 2413