IS WORK OVER?

Automation index

How much of a Aerospace engineer’s job can AI already do?

A calculation and a model come earlier. Signing a part that actually flies does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Aerospace engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, simulate and certify structures and systems.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and traceability.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bench, test flight and incidents.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vendors, quality and EASA.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versions and configuration.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign something that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, tolerances and traceability
  • Bench, test flight and incidents
  • Vendors, quality and EASA
  • Documentation, versions and configuration
  • Sign something that will not fall
  • ingeniero aeronautico
  • aerospace engineer

Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144

Embryologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Retrieval, oocytes and the culture.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
ICSI, the sperm and the one that will not fertilise.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Time-lapse, the grade and picking.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Transfer, the catheter and not losing the embryo.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The file, the double check and not mixing couples.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Pick it, and not mixing the file.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • oocytes
  • ICSI
  • embryo culture
  • time-lapse
  • transfer
  • double check
  • egg retrieval
  • embryo grade

Sources for this job· O*NET 29-2011.00· ESCO/ISCO 2131

Analyse my job

Jobs with similar scores

  1. 230Pharmacist25%
  2. 231Administrative agent25%
  3. 232Historian25%
  4. 234Environmental engineer25%
  5. 235Biomedical engineer25%
  6. 236Civil engineer25%