IS WORK OVER?

Automation index

How much of a Aerospace engineer’s job can AI already do?

A calculation and a model come earlier. Signing a part that actually flies does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Aerospace engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, simulate and certify structures and systems.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and traceability.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bench, test flight and incidents.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vendors, quality and EASA.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versions and configuration.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign something that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, tolerances and traceability
  • Bench, test flight and incidents
  • Vendors, quality and EASA
  • Documentation, versions and configuration
  • Sign something that will not fall
  • ingeniero aeronautico
  • aerospace engineer

Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144

Hydrologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Hydrograph, catchment and the model.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, gauging and the one that does not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Flood, the alert and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Low flow, irrigation and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The authority, the figure and not dressing the flow.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If the river rises, call it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hydrographs
  • catchments
  • gauging
  • floods
  • low flow
  • hydrology alerts
  • flows
  • the river authority

Sources for this job· O*NET 19-2043.00· ESCO/ISCO 2114

Analyse my job

Jobs with similar scores

  1. 225Pharmacist25%
  2. 226Administrative agent25%
  3. 227Historian25%
  4. 229Environmental engineer25%
  5. 230Biomedical engineer25%
  6. 231Civil engineer25%