IS WORK OVER?

Automation index

How much of a Aerospace engineer’s job can AI already do?

A calculation and a model come earlier. Signing a part that actually flies does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Aerospace engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, simulate and certify structures and systems.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and traceability.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bench, test flight and incidents.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vendors, quality and EASA.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versions and configuration.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign something that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, tolerances and traceability
  • Bench, test flight and incidents
  • Vendors, quality and EASA
  • Documentation, versions and configuration
  • Sign something that will not fall
  • ingeniero aeronautico
  • aerospace engineer

Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144

Instructional designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Aim, the storyboard and the module.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Pilot, the learner and what is not understood.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Activity, the feedback and not putting a silly test.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
LMS, the figure and not inflating completion.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the deadline and not cutting the practice.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That they learn, and not leaving the empty video.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • course storyboard
  • modules
  • learner pilot
  • activities
  • LMS
  • completion
  • feedback
  • not a silly test

Sources for this job· O*NET 25-9031.00· ESCO/ISCO 2351

Analyse my job

Jobs with similar scores

  1. 249Pharmacist25%
  2. 250Administrative agent25%
  3. 251Historian25%
  4. 253Environmental engineer25%
  5. 254Biomedical engineer25%
  6. 255Civil engineer25%