Automation index
How much of a Aerospace engineer’s job can AI already do?
A calculation and a model come earlier. Signing a part that actually flies does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Aerospace engineer
25%
AI can already do 25% of this job.
#228 / 623
View rankingAerospace engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, simulate and certify structures and systems.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, tolerances and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bench, test flight and incidents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vendors, quality and EASA.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versions and configuration.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign something that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Drawings, tolerances and traceability
- Bench, test flight and incidents
- Vendors, quality and EASA
- Documentation, versions and configuration
- Sign something that will not fall
- ingeniero aeronautico
- aerospace engineer
Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144
IS WORK OVER?
Route planner
28%
#112 / 623
View rankingRoute planner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Optimise, windows and capacity.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Restrictions, tolls and the right vehicle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The salesperson who promises and the plan that will not.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Recalc, incidents and the next day.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The warehouse, the cut-off and not leaving the last one.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it fits, and not blowing the hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- optimise routes
- delivery windows
- tolls
- vehicle capacity
- recalc
- traffic restrictions
- warehouse cut-off
- driving hours
Sources for this job· O*NET 13-1081.00· ESCO/ISCO 4323