IS WORK OVER?

Automation index

How much of a Aerospace engineer’s job can AI already do?

A calculation and a model come earlier. Signing a part that actually flies does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Aerospace engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, simulate and certify structures and systems.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and traceability.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bench, test flight and incidents.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vendors, quality and EASA.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versions and configuration.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign something that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, tolerances and traceability
  • Bench, test flight and incidents
  • Vendors, quality and EASA
  • Documentation, versions and configuration
  • Sign something that will not fall
  • ingeniero aeronautico
  • aerospace engineer

Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144

Train conductor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Consist, brakes and the departure sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Platform, close-up and the one left outside.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Incidents, Control and the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Ticket staff, the fare dodger and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the points and not leaving early.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Leave nobody behind, and sign the consist.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • train consist
  • platform close-up
  • departure sheet
  • Control
  • brake check
  • line incidents
  • halts
  • delays

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312

Analyse my job

Jobs with similar scores

  1. 225Pharmacist25%
  2. 226Administrative agent25%
  3. 227Historian25%
  4. 229Environmental engineer25%
  5. 230Biomedical engineer25%
  6. 231Civil engineer25%