IS WORK OVER?

Automation index

How much of a Aerospace technician’s job can AI already do?

A bench protocol comes earlier. Torquing the right one without leaving lockwire loose do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Aerospace technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bench, the protocol and the torque.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Part, the lockwire and the one left loose.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
NDT, the crack and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Engine, the run and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The engineer, the rush and not signing half done.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Torque it, and not leaving the lockwire loose.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • test bench
  • torque
  • lockwire
  • aerospace NDT
  • engine runs
  • protocols
  • cracks
  • not sign half done

Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 654Milliner19%
  2. 655Well driller19%
  3. 656Woodcarver19%
  4. 658Wind-turbine technician19%
  5. 659Histology technician19%
  6. 660Battery technician19%