Automation index
How much of a Agronomist’s job can AI already do?
A crop map and a dose come earlier. Walking the farm and not ruining the harvest do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Agronomist
22%
AI can already do 22% of this job.
#383 / 733
View rankingAgronomist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Maps, doses and fertiliser and irrigation plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Projects, subsidy files and paperwork.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Field, sampling and pests.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Farmer, co-op and administration.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Water, soils and sustainability.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not prescribing a pesticide blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Projects, subsidy files and paperwork
- Field, sampling and pests
- Farmer, co-op and administration
- Water, soils and sustainability
- Not prescribing a pesticide blind
- ingeniero agronomo
- agronomist
Sources for this job· O*NET 17-2021.00· ESCO/ISCO 2144
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142