Automation index
How much of a Agronomist’s job can AI already do?
A crop map and a dose come earlier. Walking the farm and not ruining the harvest do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Agronomist
22%
AI can already do 22% of this job.
#340 / 633
View rankingAgronomist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Maps, doses and fertiliser and irrigation plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Projects, subsidy files and paperwork.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Field, sampling and pests.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Farmer, co-op and administration.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Water, soils and sustainability.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not prescribing a pesticide blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Projects, subsidy files and paperwork
- Field, sampling and pests
- Farmer, co-op and administration
- Water, soils and sustainability
- Not prescribing a pesticide blind
- ingeniero agronomo
- agronomist
Sources for this job· O*NET 17-2021.00· ESCO/ISCO 2144
IS WORK OVER?
Mining engineer
22%
#341 / 633
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146