IS WORK OVER?

Automation index

How much of a Agronomist’s job can AI already do?

A crop map and a dose come earlier. Walking the farm and not ruining the harvest do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Agronomist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Maps, doses and fertiliser and irrigation plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Projects, subsidy files and paperwork.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Field, sampling and pests.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Farmer, co-op and administration.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Water, soils and sustainability.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not prescribing a pesticide blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Projects, subsidy files and paperwork
  • Field, sampling and pests
  • Farmer, co-op and administration
  • Water, soils and sustainability
  • Not prescribing a pesticide blind
  • ingeniero agronomo
  • agronomist

Sources for this job· O*NET 17-2021.00· ESCO/ISCO 2144

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 337Nature guide22%
  2. 338Ice-cream maker22%
  3. 339Hydrologist22%
  4. 341Mining engineer22%
  5. 342Forestry engineer22%
  6. 343EV charger installer22%