IS WORK OVER?

Automation index

How much of a Agronomist’s job can AI already do?

A crop map and a dose come earlier. Walking the farm and not ruining the harvest do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Agronomist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Maps, doses and fertiliser and irrigation plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Projects, subsidy files and paperwork.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Field, sampling and pests.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Farmer, co-op and administration.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Water, soils and sustainability.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not prescribing a pesticide blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Projects, subsidy files and paperwork
  • Field, sampling and pests
  • Farmer, co-op and administration
  • Water, soils and sustainability
  • Not prescribing a pesticide blind
  • ingeniero agronomo
  • agronomist

Sources for this job· O*NET 17-2021.00· ESCO/ISCO 2144

PLC programmer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Ladder, tags and the comment.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cell, the fault and the one that will not stop.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
E-stop, the cable and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Recipe, the change and not dumping production.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The electrician, the terminals and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it stops on a fault, and not jumping the e-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program PLCs
  • tags
  • e-stops
  • faults
  • recipes
  • terminals
  • program comments
  • not jump e-stops

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514

Analyse my job

Jobs with similar scores

  1. 382Nature guide22%
  2. 383Ice-cream maker22%
  3. 384Hydrologist22%
  4. 386Control engineer22%
  5. 387Corrosion engineer22%
  6. 388Instrumentation engineer22%