IS WORK OVER?

Automation index

How much of a Agronomist’s job can AI already do?

A crop map and a dose come earlier. Walking the farm and not ruining the harvest do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Agronomist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Maps, doses and fertiliser and irrigation plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Projects, subsidy files and paperwork.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Field, sampling and pests.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Farmer, co-op and administration.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Water, soils and sustainability.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not prescribing a pesticide blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Projects, subsidy files and paperwork
  • Field, sampling and pests
  • Farmer, co-op and administration
  • Water, soils and sustainability
  • Not prescribing a pesticide blind
  • ingeniero agronomo
  • agronomist

Sources for this job· O*NET 17-2021.00· ESCO/ISCO 2144

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 380Nature guide22%
  2. 381Ice-cream maker22%
  3. 382Hydrologist22%
  4. 384Mechatronics engineer22%
  5. 385Mining engineer22%
  6. 386Bridge engineer22%