IS WORK OVER?

Automation index

How much of a Agronomist’s job can AI already do?

A crop map and a dose come earlier. Walking the farm and not ruining the harvest do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Agronomist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Maps, doses and fertiliser and irrigation plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Projects, subsidy files and paperwork.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Field, sampling and pests.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Farmer, co-op and administration.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Water, soils and sustainability.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not prescribing a pesticide blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Projects, subsidy files and paperwork
  • Field, sampling and pests
  • Farmer, co-op and administration
  • Water, soils and sustainability
  • Not prescribing a pesticide blind
  • ingeniero agronomo
  • agronomist

Sources for this job· O*NET 17-2021.00· ESCO/ISCO 2144

Substation technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Switching, the sheet and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bay, the earth and not going in without it.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Oil, the analysis and the one that bites.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fault, the disconnector and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Control and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Open the right one, and not going in unearthed.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • switching
  • substation sheets
  • earths
  • bays
  • oil
  • lockouts
  • disconnectors
  • not go in unearthed

Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113

Analyse my job

Jobs with similar scores

  1. 385Nature guide22%
  2. 386Ice-cream maker22%
  3. 387Hydrologist22%
  4. 389Control engineer22%
  5. 390Corrosion engineer22%
  6. 391Instrumentation engineer22%