IS WORK OVER?

Automation index

How much of a Aid worker’s job can AI already do?

A logframe comes earlier. Being there when it goes wrong, and doing no harm, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Aid worker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Forms, logframe and the indicators.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
The field, local partners and what the spreadsheet misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Donor reports and the paperwork.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Security, evacuation and the call to stay.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Community, conflict and not replacing the local.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Do no harm and owning the project.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • logframe
  • field work
  • justify projects
  • local partners
  • mission security
  • aid indicators
  • donor reports
  • do no harm

Sources for this job· O*NET 21-1093.00· ESCO/ISCO 2635

Aerospace engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, simulate and certify structures and systems.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and traceability.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bench, test flight and incidents.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vendors, quality and EASA.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versions and configuration.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign something that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, tolerances and traceability
  • Bench, test flight and incidents
  • Vendors, quality and EASA
  • Documentation, versions and configuration
  • Sign something that will not fall
  • ingeniero aeronautico
  • aerospace engineer

Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144

Analyse my job

Jobs with similar scores

  1. 289Nursing assistant23%
  2. 290Cardiologist23%
  3. 291Museum curator23%
  4. 293Dermatologist23%
  5. 294Art director23%
  6. 295Occupational trainer23%