IS WORK OVER?

Automation index

How much of a Air traffic controller’s job can AI already do?

Labels and alerts already help. Separating two aircraft in fog, and talking to both, is not something you hand off.

This percentage does not predict how many people will lose their jobs.

Task comparison

Air traffic controller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan sequences and read traffic forecasts.
Estimate

No public source provides a precise figure. This is our estimate.

18%32%+5.8
Strips, tickets and inter-unit coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Tactical control of aircraft on frequency.
Estimate

No public source provides a precise figure. This is our estimate.

22%6%+1.3
Resolve conflicts, radio failures and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Train and supervise a controller under instruction.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Reports, incidents and shift fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Plan sequences and read traffic forecasts
  • Tactical control of aircraft on frequency
  • Reports, incidents and shift fatigue
  • controlador aereo
  • air traffic
  • atc
  • torre de control

Sources for this job· O*NET 53-2021.00· ESCO/ISCO 3154

Cloud architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagrams, ADRs and a first IaC pass.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Cost estimate, Well-Architected and gaps.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Review PRs, security and network.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Align with security, finops and product.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
PoCs, real failures and vendor limits.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sign the design and own the incident.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Diagrams, ADRs and a first IaC pass
  • Cost estimate, Well-Architected and gaps
  • Review PRs, security and network
  • Align with security, finops and product
  • PoCs, real failures and vendor limits
  • Sign the design and own the incident
  • arquitecto cloud

Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 595Actor17%
  2. 596Kitchen porter17%
  3. 597Forklift operator17%
  4. 599Glazier17%
  5. 600Rebar worker17%
  6. 601Makeup artist17%