IS WORK OVER?

Automation index

How much of a Air traffic controller’s job can AI already do?

Labels and alerts already help. Separating two aircraft in fog, and talking to both, is not something you hand off.

This percentage does not predict how many people will lose their jobs.

Task comparison

Air traffic controller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan sequences and read traffic forecasts.
Estimate

No public source provides a precise figure. This is our estimate.

18%32%+5.8
Strips, tickets and inter-unit coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Tactical control of aircraft on frequency.
Estimate

No public source provides a precise figure. This is our estimate.

22%6%+1.3
Resolve conflicts, radio failures and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Train and supervise a controller under instruction.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Reports, incidents and shift fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Plan sequences and read traffic forecasts
  • Tactical control of aircraft on frequency
  • Reports, incidents and shift fatigue
  • controlador aereo
  • air traffic
  • atc
  • torre de control

Sources for this job· O*NET 53-2021.00· ESCO/ISCO 3154

Commissioning engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Protocol, the loop and the punch.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, start-up and the one that is not ready.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Test, the trip and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Vendors, the one who does not come and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the deadline and not signing half done.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Start up, and not leaving the interlock jumped.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • test protocols
  • loops
  • punch list
  • start-up
  • trips
  • vendors
  • interlocks
  • not sign half done

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 695Actor17%
  2. 696Kitchen porter17%
  3. 697Forklift operator17%
  4. 699Glazier17%
  5. 700Rebar worker17%
  6. 701Makeup artist17%