Automation index
How much of a Air traffic controller’s job can AI already do?
Labels and alerts already help. Separating two aircraft in fog, and talking to both, is not something you hand off.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Air traffic controller
17%
AI can already do 17% of this job.
#598 / 643
View rankingAir traffic controller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan sequences and read traffic forecasts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 32% | +5.8 |
Strips, tickets and inter-unit coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Tactical control of aircraft on frequency.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 6% | +1.3 |
Resolve conflicts, radio failures and weather.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Train and supervise a controller under instruction.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Reports, incidents and shift fatigue.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Plan sequences and read traffic forecasts
- Tactical control of aircraft on frequency
- Reports, incidents and shift fatigue
- controlador aereo
- air traffic
- atc
- torre de control
Sources for this job· O*NET 53-2021.00· ESCO/ISCO 3154
IS WORK OVER?
Excavator operator
18%
#584 / 643
View rankingExcavator operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, levels and the machine log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Dig, load and the batter that comes in.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Services, the blind pipe and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, grease and the pin that snaps.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The labourer, the lorry and covering nobody.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Not breaking what is buried, and leaving a clean formation.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dig with excavator
- load lorries
- batters
- buried services
- set-out levels
- grease the machine
- formation
- site GPS
Sources for this job· O*NET 47-2073.00· ESCO/ISCO 8342