Automation index
How much of a Air traffic controller’s job can AI already do?
Labels and alerts already help. Separating two aircraft in fog, and talking to both, is not something you hand off.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Air traffic controller
17%
AI can already do 17% of this job.
#598 / 643
View rankingAir traffic controller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan sequences and read traffic forecasts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 32% | +5.8 |
Strips, tickets and inter-unit coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Tactical control of aircraft on frequency.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 6% | +1.3 |
Resolve conflicts, radio failures and weather.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Train and supervise a controller under instruction.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Reports, incidents and shift fatigue.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Plan sequences and read traffic forecasts
- Tactical control of aircraft on frequency
- Reports, incidents and shift fatigue
- controlador aereo
- air traffic
- atc
- torre de control
Sources for this job· O*NET 53-2021.00· ESCO/ISCO 3154
IS WORK OVER?
Geologist
23%
#301 / 643
View rankingGeologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Maps, sections and a first report.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 42% | +8.4 |
Process boreholes, GIS and lab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 35% | +5.6 |
Field camp, outcrop and sampling.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Read hazard, water and deposit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Talk to works, mine or government.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
Sign the opinion and own the real ground.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Maps, sections and a first report
- Process boreholes, GIS and lab
- Field camp, outcrop and sampling
- Read hazard, water and deposit
- Talk to works, mine or government
- Sign the opinion and own the real ground
- geologo
- geologist
Sources for this job· O*NET 19-2042.00· ESCO/ISCO 2114