IS WORK OVER?

Automation index

How much of a Air traffic controller’s job can AI already do?

Labels and alerts already help. Separating two aircraft in fog, and talking to both, is not something you hand off.

This percentage does not predict how many people will lose their jobs.

Task comparison

Air traffic controller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan sequences and read traffic forecasts.
Estimate

No public source provides a precise figure. This is our estimate.

18%32%+5.8
Strips, tickets and inter-unit coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Tactical control of aircraft on frequency.
Estimate

No public source provides a precise figure. This is our estimate.

22%6%+1.3
Resolve conflicts, radio failures and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Train and supervise a controller under instruction.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Reports, incidents and shift fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Plan sequences and read traffic forecasts
  • Tactical control of aircraft on frequency
  • Reports, incidents and shift fatigue
  • controlador aereo
  • air traffic
  • atc
  • torre de control

Sources for this job· O*NET 53-2021.00· ESCO/ISCO 3154

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 695Actor17%
  2. 696Kitchen porter17%
  3. 697Forklift operator17%
  4. 699Glazier17%
  5. 700Rebar worker17%
  6. 701Makeup artist17%