IS WORK OVER?

Automation index

How much of a Air traffic controller’s job can AI already do?

Labels and alerts already help. Separating two aircraft in fog, and talking to both, is not something you hand off.

This percentage does not predict how many people will lose their jobs.

Task comparison

Air traffic controller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan sequences and read traffic forecasts.
Estimate

No public source provides a precise figure. This is our estimate.

18%32%+5.8
Strips, tickets and inter-unit coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Tactical control of aircraft on frequency.
Estimate

No public source provides a precise figure. This is our estimate.

22%6%+1.3
Resolve conflicts, radio failures and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Train and supervise a controller under instruction.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Reports, incidents and shift fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Plan sequences and read traffic forecasts
  • Tactical control of aircraft on frequency
  • Reports, incidents and shift fatigue
  • controlador aereo
  • air traffic
  • atc
  • torre de control

Sources for this job· O*NET 53-2021.00· ESCO/ISCO 3154

Piling operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, level and each pile’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, bore and refusal.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Cage, pour and the tube that rides up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vibration, the neighbour and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Plant, access and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
To level, and not cracking party walls.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive piles
  • bore
  • cages
  • refusal level
  • site vibration
  • pour piles
  • piling set-out
  • recoverable tubes

Sources for this job· O*NET 47-2073.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 585Actor17%
  2. 586Kitchen porter17%
  3. 587Forklift operator17%
  4. 589Glazier17%
  5. 590Rebar worker17%
  6. 591Makeup artist17%