IS WORK OVER?

Automation index

How much of a Air traffic controller’s job can AI already do?

Labels and alerts already help. Separating two aircraft in fog, and talking to both, is not something you hand off.

This percentage does not predict how many people will lose their jobs.

Task comparison

Air traffic controller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan sequences and read traffic forecasts.
Estimate

No public source provides a precise figure. This is our estimate.

18%32%+5.8
Strips, tickets and inter-unit coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Tactical control of aircraft on frequency.
Estimate

No public source provides a precise figure. This is our estimate.

22%6%+1.3
Resolve conflicts, radio failures and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Train and supervise a controller under instruction.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Reports, incidents and shift fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Plan sequences and read traffic forecasts
  • Tactical control of aircraft on frequency
  • Reports, incidents and shift fatigue
  • controlador aereo
  • air traffic
  • atc
  • torre de control

Sources for this job· O*NET 53-2021.00· ESCO/ISCO 3154

Product owner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Write stories, criteria and backlog.
Estimate

No public source provides a precise figure. This is our estimate.

22%50%+11
Maps, roadmaps and release notes.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Refine with engineering and design.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Talk to users and stakeholders.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Prioritise, cut scope and say no.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Accept the increment and own the value.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Write stories, criteria and backlog
  • Maps, roadmaps and release notes
  • Refine with engineering and design
  • Talk to users and stakeholders
  • Prioritise, cut scope and say no
  • Accept the increment and own the value
  • product owner
  • po agil

Sources for this job· O*NET 15-1199.09· ESCO/ISCO 2519

Analyse my job

Jobs with similar scores

  1. 595Actor17%
  2. 596Kitchen porter17%
  3. 597Forklift operator17%
  4. 599Glazier17%
  5. 600Rebar worker17%
  6. 601Makeup artist17%