IS WORK OVER?

Automation index

How much of a Air traffic controller’s job can AI already do?

Labels and alerts already help. Separating two aircraft in fog, and talking to both, is not something you hand off.

This percentage does not predict how many people will lose their jobs.

Task comparison

Air traffic controller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan sequences and read traffic forecasts.
Estimate

No public source provides a precise figure. This is our estimate.

18%32%+5.8
Strips, tickets and inter-unit coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Tactical control of aircraft on frequency.
Estimate

No public source provides a precise figure. This is our estimate.

22%6%+1.3
Resolve conflicts, radio failures and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Train and supervise a controller under instruction.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Reports, incidents and shift fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Plan sequences and read traffic forecasts
  • Tactical control of aircraft on frequency
  • Reports, incidents and shift fatigue
  • controlador aereo
  • air traffic
  • atc
  • torre de control

Sources for this job· O*NET 53-2021.00· ESCO/ISCO 3154

Property valuer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Comps, cadastre and a first value.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Visit, measurements and defects.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Report, photos and bank annexes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Client, lender and valuation deadlines.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Valuation rules and liability.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not signing a flat that is not worth that.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Comps, cadastre and a first value
  • Visit, measurements and defects
  • Report, photos and bank annexes
  • Client, lender and valuation deadlines
  • Valuation rules and liability
  • Not signing a flat that is not worth that
  • tasador inmobiliario
  • tasador
  • property valuer

Sources for this job· O*NET 13-2023.00· ESCO/ISCO 3315

Analyse my job

Jobs with similar scores

  1. 595Actor17%
  2. 596Kitchen porter17%
  3. 597Forklift operator17%
  4. 599Glazier17%
  5. 600Rebar worker17%
  6. 601Makeup artist17%