Automation index
How much of a Air traffic controller’s job can AI already do?
Labels and alerts already help. Separating two aircraft in fog, and talking to both, is not something you hand off.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Air traffic controller
17%
AI can already do 17% of this job.
#588 / 633
View rankingAir traffic controller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan sequences and read traffic forecasts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 32% | +5.8 |
Strips, tickets and inter-unit coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Tactical control of aircraft on frequency.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 6% | +1.3 |
Resolve conflicts, radio failures and weather.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Train and supervise a controller under instruction.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Reports, incidents and shift fatigue.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Plan sequences and read traffic forecasts
- Tactical control of aircraft on frequency
- Reports, incidents and shift fatigue
- controlador aereo
- air traffic
- atc
- torre de control
Sources for this job· O*NET 53-2021.00· ESCO/ISCO 3154
IS WORK OVER?
Structural engineer
26%
#204 / 633
View rankingStructural engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, combinations and the calculation annex.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Site, rebar and what was not poured that way.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Code, building regs and the sizing note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Pathology, the crack and shore or not.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The architect, the deadline and not trimming the depth.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Sign that it stands, and not hiding the assumption.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- calculate structures
- frame model
- calculation annex
- building regs
- rebar
- structural pathology
- load combinations
- shore
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142