Automation index
How much of a Air traffic controller’s job can AI already do?
Labels and alerts already help. Separating two aircraft in fog, and talking to both, is not something you hand off.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Air traffic controller
17%
AI can already do 17% of this job.
#598 / 643
View rankingAir traffic controller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan sequences and read traffic forecasts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 32% | +5.8 |
Strips, tickets and inter-unit coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Tactical control of aircraft on frequency.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 6% | +1.3 |
Resolve conflicts, radio failures and weather.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Train and supervise a controller under instruction.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Reports, incidents and shift fatigue.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Plan sequences and read traffic forecasts
- Tactical control of aircraft on frequency
- Reports, incidents and shift fatigue
- controlador aereo
- air traffic
- atc
- torre de control
Sources for this job· O*NET 53-2021.00· ESCO/ISCO 3154
IS WORK OVER?
Tower crane operator
18%
#583 / 643
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343