Automation index
How much of a Aircraft mechanic’s job can AI already do?
A manual and a maintenance log come earlier. Signing an aircraft so it flies whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Aircraft mechanic
23%
AI can already do 23% of this job.
#337 / 733
View rankingAircraft mechanic
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read the manual, bulletins and the work order.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Inspect, strip, adjust and refit systems.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 12% | +2.6 |
Diagnosis, parts and functional tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Logs, CRS and traceability of the job.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Hangar, line and coordination with crew and ops.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Licence, stamp and airworthiness liability.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- maintain aircraft
- inspect airframes
- replace components
- sign CRS
- aircraft diagnosis
- functional tests
- read service bulletins
- airworthiness
Sources for this job· O*NET 49-3011.00· ESCO/ISCO 7232
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142