Automation index
How much of a Aircraft mechanic’s job can AI already do?
A manual and a maintenance log come earlier. Signing an aircraft so it flies whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Aircraft mechanic
23%
AI can already do 23% of this job.
#303 / 633
View rankingAircraft mechanic
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read the manual, bulletins and the work order.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Inspect, strip, adjust and refit systems.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 12% | +2.6 |
Diagnosis, parts and functional tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Logs, CRS and traceability of the job.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Hangar, line and coordination with crew and ops.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Licence, stamp and airworthiness liability.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- maintain aircraft
- inspect airframes
- replace components
- sign CRS
- aircraft diagnosis
- functional tests
- read service bulletins
- airworthiness
Sources for this job· O*NET 49-3011.00· ESCO/ISCO 7232
IS WORK OVER?
Piling operator
19%
#521 / 633
View rankingPiling operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, level and each pile’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive, bore and refusal.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Cage, pour and the tube that rides up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vibration, the neighbour and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Plant, access and the one that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
To level, and not cracking party walls.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive piles
- bore
- cages
- refusal level
- site vibration
- pour piles
- piling set-out
- recoverable tubes
Sources for this job· O*NET 47-2073.00· ESCO/ISCO 7114