IS WORK OVER?

Automation index

How much of a Aircraft mechanic’s job can AI already do?

A manual and a maintenance log come earlier. Signing an aircraft so it flies whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Aircraft mechanic

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read the manual, bulletins and the work order.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Inspect, strip, adjust and refit systems.
Estimate

No public source provides a precise figure. This is our estimate.

22%12%+2.6
Diagnosis, parts and functional tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Logs, CRS and traceability of the job.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Hangar, line and coordination with crew and ops.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Licence, stamp and airworthiness liability.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • maintain aircraft
  • inspect airframes
  • replace components
  • sign CRS
  • aircraft diagnosis
  • functional tests
  • read service bulletins
  • airworthiness

Sources for this job· O*NET 49-3011.00· ESCO/ISCO 7232

Piling operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, level and each pile’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, bore and refusal.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Cage, pour and the tube that rides up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vibration, the neighbour and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Plant, access and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
To level, and not cracking party walls.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive piles
  • bore
  • cages
  • refusal level
  • site vibration
  • pour piles
  • piling set-out
  • recoverable tubes

Sources for this job· O*NET 47-2073.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 300Alarm installer23%
  2. 301Home-automation installer23%
  3. 302Station master23%
  4. 304Family doctor23%
  5. 305Sports physician23%
  6. 306Forensic pathologist23%