IS WORK OVER?

Automation index

How much of a Aircraft mechanic’s job can AI already do?

A manual and a maintenance log come earlier. Signing an aircraft so it flies whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Aircraft mechanic

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read the manual, bulletins and the work order.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Inspect, strip, adjust and refit systems.
Estimate

No public source provides a precise figure. This is our estimate.

22%12%+2.6
Diagnosis, parts and functional tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Logs, CRS and traceability of the job.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Hangar, line and coordination with crew and ops.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Licence, stamp and airworthiness liability.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • maintain aircraft
  • inspect airframes
  • replace components
  • sign CRS
  • aircraft diagnosis
  • functional tests
  • read service bulletins
  • airworthiness

Sources for this job· O*NET 49-3011.00· ESCO/ISCO 7232

Reliability engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Data, MTBF and the Pareto.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Failure, the cause and not patching twice.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Spare, the critical and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
RCM, the plan and the one that is not done.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, the rush and not running the tired one.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not drop at three, and not hiding the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • MTBF
  • Pareto
  • root causes
  • critical spares
  • RCM
  • failures
  • maintenance plans
  • not patch twice

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 334Alarm installer23%
  2. 335Home-automation installer23%
  3. 336Station master23%
  4. 338Family doctor23%
  5. 339Sports physician23%
  6. 340Forensic pathologist23%