Automation index
How much of a Aircraft mechanic’s job can AI already do?
A manual and a maintenance log come earlier. Signing an aircraft so it flies whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Aircraft mechanic
23%
AI can already do 23% of this job.
#303 / 633
View rankingAircraft mechanic
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read the manual, bulletins and the work order.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Inspect, strip, adjust and refit systems.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 12% | +2.6 |
Diagnosis, parts and functional tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Logs, CRS and traceability of the job.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Hangar, line and coordination with crew and ops.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Licence, stamp and airworthiness liability.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- maintain aircraft
- inspect airframes
- replace components
- sign CRS
- aircraft diagnosis
- functional tests
- read service bulletins
- airworthiness
Sources for this job· O*NET 49-3011.00· ESCO/ISCO 7232
IS WORK OVER?
Stagehand
19%
#545 / 633
View rankingStagehand
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plot, marks and the weight.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Change, blackout and the one who is late.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Loads, pulleys and the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Technical rehearsal and the one who walks the light.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The show, the surprise and not improvising loads.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Take nobody down, and the change on time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- blackout changes
- stage marks
- pulleys
- loads
- technical rehearsal
- sets
- the show
- weights
Sources for this job· O*NET 27-2099.00· ESCO/ISCO 3435