IS WORK OVER?

Automation index

Can AI do the work of a Airline pilot?

Flight plan and weather already process themselves. Deciding in a failure, talking to the cabin, and landing do not.

It also does not predict how many people will lose their jobs.

Task comparison

Airline pilot

Where the time goes

Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.

Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.

TaskShareAIAdds
Prepare flight plan, fuel and NOTAMs.
Estimate

No public source pins this saving. It is an estimate of the method.

18%40%+7.2
Weather and company briefing.
Estimate

No public source pins this saving. It is an estimate of the method.

14%32%+4.5
Flying: take-off, cruise and landing.
Estimate

No public source pins this saving. It is an estimate of the method.

22%8%+1.8
Failures, diversions and emergencies.
Estimate

No public source pins this saving. It is an estimate of the method.

16%12%+1.9
Coordination with ATC, cabin and ground.
Estimate

No public source pins this saving. It is an estimate of the method.

16%10%+1.6
Reports, logbook and fatigue compliance.
Estimate

No public source pins this saving. It is an estimate of the method.

14%15%+2.1
Total100%19%

Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low

Skills this job uses

  • Prepare flight plan, fuel and NOTAMs
  • Weather and company briefing
  • Flying: take-off, cruise and landing
  • Failures, diversions and emergencies
  • Coordination with ATC, cabin and ground
  • Reports, logbook and fatigue compliance
  • piloto
  • pilot
  • aviacion
  • comandante de aeronave

Sources for this job· O*NET 53-2011.00· ESCO/ISCO 3153

Mason

Where the time goes

Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.

Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.

TaskShareAIAdds
Read drawings, measure and order material.
Estimate

No public source pins this saving. It is an estimate of the method.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source pins this saving. It is an estimate of the method.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source pins this saving. It is an estimate of the method.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source pins this saving. It is an estimate of the method.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source pins this saving. It is an estimate of the method.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source pins this saving. It is an estimate of the method.

14%15%+2.1
Total100%15%

Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low

Skills this job uses

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Analyse my job

Nearby in the ranking

  1. 90Dietitian20%
  2. 91Executive chef19%
  3. 92Judge19%
  4. 94Lighting technician18%
  5. 95Actor17%
  6. 96Police officer17%