Automation index
How much of a Airport ramp agent’s job can AI already do?
A load plan comes earlier. Pushing the aircraft, the bags and not getting the trim wrong do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Airport ramp agent
21%
AI can already do 21% of this job.
#404 / 633
View rankingAirport ramp agent
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Load plan, LIR and hold allocation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Load, unload, pushback and ramp assistance.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Bags, ULDs and special cargo.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordinate with crew, ops and fuel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Times, delays and ramp safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Trim, papers and liability for the load.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- load aircraft
- do pushback
- allocate holds
- move bags
- load planning
- ramp assistance
- handle ULDs
- ramp safety
Sources for this job· O*NET 53-6051.00· ESCO/ISCO 9333
IS WORK OVER?
3D animator
30%
#45 / 633
View ranking3D animator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Blocking, layouts and previews.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 52% | +11.4 |
Simple rigs, cycles and technical cleanup.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 45% | +8.1 |
Spline, weight and character acting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 20% | +3.2 |
Director and supervisor notes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Integrate with lighting, fx and editorial.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Taste: which shot lives and which dies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 30% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Blocking, layouts and previews
- Simple rigs, cycles and technical cleanup
- Spline, weight and character acting
- Director and supervisor notes
- Integrate with lighting, fx and editorial
- Taste: which shot lives and which dies
- animador 3d
- 3d animator
- motion graphics
Sources for this job· O*NET 27-1014.00· ESCO/ISCO 2166