Automation index
How much of a Airport ramp agent’s job can AI already do?
A load plan comes earlier. Pushing the aircraft, the bags and not getting the trim wrong do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Airport ramp agent
21%
AI can already do 21% of this job.
#404 / 633
View rankingAirport ramp agent
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Load plan, LIR and hold allocation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Load, unload, pushback and ramp assistance.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Bags, ULDs and special cargo.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordinate with crew, ops and fuel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Times, delays and ramp safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Trim, papers and liability for the load.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- load aircraft
- do pushback
- allocate holds
- move bags
- load planning
- ramp assistance
- handle ULDs
- ramp safety
Sources for this job· O*NET 53-6051.00· ESCO/ISCO 9333
IS WORK OVER?
Actuary
32%
#25 / 633
View rankingActuary
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Run models, reserves and sensitivities.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 55% | +13.2 |
Draft technical reports and memos.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Choose assumptions, tables and criteria.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Explain to the board and the supervisor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Validate data quality and bias.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Signed opinion and professional liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 18% | +2.2 |
| Total | 100% | 32% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Run models, reserves and sensitivities
- Draft technical reports and memos
- Choose assumptions, tables and criteria
- Explain to the board and the supervisor
- Validate data quality and bias
- Signed opinion and professional liability
- actuario
- actuary
Sources for this job· O*NET 15-2011.00· ESCO/ISCO 2120