IS WORK OVER?

Automation index

How much of a Airport ramp agent’s job can AI already do?

A load plan comes earlier. Pushing the aircraft, the bags and not getting the trim wrong do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Airport ramp agent

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Load plan, LIR and hold allocation.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Load, unload, pushback and ramp assistance.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Bags, ULDs and special cargo.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordinate with crew, ops and fuel.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Times, delays and ramp safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Trim, papers and liability for the load.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • load aircraft
  • do pushback
  • allocate holds
  • move bags
  • load planning
  • ramp assistance
  • handle ULDs
  • ramp safety

Sources for this job· O*NET 53-6051.00· ESCO/ISCO 9333

Cloud architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagrams, ADRs and a first IaC pass.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Cost estimate, Well-Architected and gaps.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Review PRs, security and network.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Align with security, finops and product.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
PoCs, real failures and vendor limits.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sign the design and own the incident.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Diagrams, ADRs and a first IaC pass
  • Cost estimate, Well-Architected and gaps
  • Review PRs, security and network
  • Align with security, finops and product
  • PoCs, real failures and vendor limits
  • Sign the design and own the incident
  • arquitecto cloud

Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 401Medical sales rep22%
  2. 402Nursery grower22%
  3. 403Zoologist22%
  4. 405Traffic warden21%
  5. 406Anaesthetist21%
  6. 407Beekeeper21%