IS WORK OVER?

Automation index

How much of a Airport ramp agent’s job can AI already do?

A load plan comes earlier. Pushing the aircraft, the bags and not getting the trim wrong do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Airport ramp agent

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Load plan, LIR and hold allocation.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Load, unload, pushback and ramp assistance.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Bags, ULDs and special cargo.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordinate with crew, ops and fuel.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Times, delays and ramp safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Trim, papers and liability for the load.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • load aircraft
  • do pushback
  • allocate holds
  • move bags
  • load planning
  • ramp assistance
  • handle ULDs
  • ramp safety

Sources for this job· O*NET 53-6051.00· ESCO/ISCO 9333

Drainlayer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawings, cameras and connection logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Open, pipe and set the fall.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Pits, gases and confined spaces.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Street, neighbours and reinstating pavement.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quantities, extras and the council.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a connection that bursts.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, cameras and connection logs
  • Open, pipe and set the fall
  • Pits, gases and confined spaces
  • Quantities, extras and the council
  • Not leaving a connection that bursts
  • pocero
  • alcantarillado
  • drainlayer

Sources for this job· O*NET 47-2151.00· ESCO/ISCO 7126

Analyse my job

Jobs with similar scores

  1. 401Medical sales rep22%
  2. 402Nursery grower22%
  3. 403Zoologist22%
  4. 405Traffic warden21%
  5. 406Anaesthetist21%
  6. 407Beekeeper21%