IS WORK OVER?

Automation index

How much of a Airport ramp agent’s job can AI already do?

A load plan comes earlier. Pushing the aircraft, the bags and not getting the trim wrong do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Airport ramp agent

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Load plan, LIR and hold allocation.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Load, unload, pushback and ramp assistance.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Bags, ULDs and special cargo.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordinate with crew, ops and fuel.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Times, delays and ramp safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Trim, papers and liability for the load.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • load aircraft
  • do pushback
  • allocate holds
  • move bags
  • load planning
  • ramp assistance
  • handle ULDs
  • ramp safety

Sources for this job· O*NET 53-6051.00· ESCO/ISCO 9333

Gas network engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, pressures and the diameter.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Trench, the weld and the one that was not x-rayed.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Leak, the detector and getting people out.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cut, the bypass and not leaving them without gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The council, the rush and not covering without testing.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the trench does not go up, and not leaving them without gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • network pressures
  • diameters
  • trenches
  • gas welds
  • leaks
  • detectors
  • bypass
  • x-rays

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2145

Analyse my job

Jobs with similar scores

  1. 496Medical sales rep22%
  2. 497Nursery grower22%
  3. 498Zoologist22%
  4. 500Traffic warden21%
  5. 501Anaesthetist21%
  6. 502Beekeeper21%