Automation index
How much of a Airport ramp agent’s job can AI already do?
A load plan comes earlier. Pushing the aircraft, the bags and not getting the trim wrong do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Airport ramp agent
21%
AI can already do 21% of this job.
#404 / 633
View rankingAirport ramp agent
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Load plan, LIR and hold allocation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Load, unload, pushback and ramp assistance.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Bags, ULDs and special cargo.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordinate with crew, ops and fuel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Times, delays and ramp safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Trim, papers and liability for the load.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- load aircraft
- do pushback
- allocate holds
- move bags
- load planning
- ramp assistance
- handle ULDs
- ramp safety
Sources for this job· O*NET 53-6051.00· ESCO/ISCO 9333
IS WORK OVER?
Power-plant operator
19%
#517 / 633
View rankingPower-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-point, parameters and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Room, alarms and the one that trips.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Start, stop and not skipping the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, isolation and the permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the grid and not forcing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The set-point, and not tripping.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- set-points
- control room
- plant SOP
- starts
- isolations
- alarms
- dispatch
- the grid
Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131