IS WORK OVER?

Automation index

How much of a Airport ramp agent’s job can AI already do?

A load plan comes earlier. Pushing the aircraft, the bags and not getting the trim wrong do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Airport ramp agent

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Load plan, LIR and hold allocation.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Load, unload, pushback and ramp assistance.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Bags, ULDs and special cargo.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordinate with crew, ops and fuel.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Times, delays and ramp safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Trim, papers and liability for the load.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • load aircraft
  • do pushback
  • allocate holds
  • move bags
  • load planning
  • ramp assistance
  • handle ULDs
  • ramp safety

Sources for this job· O*NET 53-6051.00· ESCO/ISCO 9333

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 480Medical sales rep22%
  2. 481Nursery grower22%
  3. 482Zoologist22%
  4. 484Traffic warden21%
  5. 485Anaesthetist21%
  6. 486Beekeeper21%